Project List
Project List

Customer | Project Name | Scope of Supply | Year |
---|---|---|---|
S*** | #1RFCC Draw Off Line Finned Pipe Fabrication | Design/Material/Fabrication/Construction | 2024 |
S*** | SL-CHP#2 Engineering Project | Design (Basic, Pressure Part, Civil, Steel Structure, Electronic) | 2024~2025 |
Z*** | S-OIL / Shaheen Project WHB & SH & Incinerator Fabrication | Design/Material/Fabrication | 2024 |
H*** | 120T/Hr auxiliary boiler emergency renovation PJT | Design/Material/Fabrication/Construction | 2024 |
P*** | Pohang) 330T/Hr No. 11 power generation boiler reheater replacement PJT | Design/Material/Fabrication/Construction | 2024~2025 |
J*** | No. 1 Bio SEC SH2 & EVAP water pipe manufacturing and installation PJT | Design/Material/Fabrication/Construction | 2024 |
W*** | Gangnam resource recovery facility panel production PJT | Design/Material/Fabrication | 2024 |
Z*** | Waste heat exchanger | Design/Material/Fabrication | 2022 |
J*** | Bio boiler #1 primary superheater tube replacement | Design/Material/Fabrication/Construction | 2022 |
D*** | #3 boiler L.T economizer & T.A.H tube replacement | Design/Material/Fabrication/Construction | 2022 |
H*** | Daegu power plant boiler conversion of fuel (2 boilers, SCR, burner, DCS and ect.) | Design/Material/Fabrication/Construction | 2022~ 2023 |
D*** | 100T/Hr 50K boiler pressure part, non-pressure part, piping, electronic replacement | Design/Material/Fabrication/Construction | 2021 |
K*** | FBHE SH block ass'y | Design/Material/ Fabrication | 2021 |
S*** | #1RFCC E-20203 tube bundle (CAT' cooler) | Design/Material/ Fabrication | 2021 |
S*** | TGTU SG-31901 # 1/2 SH tube ass'y | Design/Material/ Fabrication | 2021 |
H*** | #3 400 T/Hr boiler surge bin SILO replacement | Design/Material/ Fabrication/Construction | 2021 |
H*** | 100T/Hr 50K boiler pressure part, non-pressure part, piping fabrication | Design/Material/ Fabrication | 2021 |
H*** | #75T/Hr boiler wall tube, bank tube, header replacement | Design/Material/Fabrication/Construction | 2021 |
H*** | SCR reactor, duct fabrication | Material/Fabrication | 2021 |
H*** | Wing wall tube panel fabrication(A213-T23) | Design/Material/Fabrication | 2021 |
H*** | #3 boiler tube panel fabrication | Design/Material/Fabrication | 2021 |
H*** | #1,2 incinerator furnace side wall tube panel replacement | Design/Material/Fabrication/Construction | 2021 |
D*** | Flare stack ignitor assembly fabrication | Design/Material/Fabrication/Startup | 2021 |
B*** | Petrochemical SCR reactor, duct fabrication | Material/Fabrication | 2021 |
D*** | 100T/Hr x 110K SS boiler pressure part, non-pressure part, piping, electronic construction | Design/Material/Fabrication/Construction/Stratup | 2020 |
J*** | #2 biomass boiler 1-R S/H manufacturing work | Design/Material/Fabrication | 2020 |
G*** | GS EPS Bio #1 boiler INTREX tube fabrication & construction | Engineering/Report | 2020 |
H*** | GP boiler wall tube panel | Design/Material/ Fabrication | 2020 |
Y*** | SCR 150T/Hr, 127T/Hr reactor | Design/Material/ Fabrication | 2020 |
Y*** | SCR 150T/Hr(1Unit), 127T/Hr(3Unit) boiler SCR construction | Design/Material/Fabrication/Construction | 2020 |
Y*** | 150T/Hr boiler dissolution super vising | Engineering/Report | 2020 |
W*** | Wall tube panel replacement | Material/Construction | 2020 |
H*** | Furnace bed cooling pipe & air nozzle replacement | Engineering/Material/Construction | 2020 |
D*** | Superheater tube coil bundle fabrication | Design/Material/ Fabrication | 2020 |
S*** | Sprocket head | Design/Material/ Fabrication | 2020 |
J*** | Superheater tube material | Design/Material/ Fabrication | 2020 |
H*** | SNCR ammonia nozzle | Design/Material/ Fabrication | 2020 |
K*** | Economizer bundle | Design/Material/ Fabrication | 2019 |
H*** | - #1~3 boiler wall tube panel - #1~3 boiler coil tube |
Design/Material/ Fabrication | 2019 |
#1~3 boiler coal surgebin silo repair | Design/Material/ Fabrication/Construction | ||
#2 LP HTR vent line elbow pin hole cause analysis | Engineering/Report | ||
#2 AUX. boiler conversion of fuel (75 T/Hr) (Burner 2 sets and accesorry) |
Design/Material/ Fabrication/Construction/Test Run | ||
#4 boiler wall tube panel | Design/Material/ Fabrication | ||
GP boiler wall tube panel | Design/Material/ Fabrication | ||
H*** | EVA. protector | Design/Material/ Fabrication/Construction | 2019 |
Air nozzle/bed cooling pipe/air damper/pressure gage repair | Design/Material/ Fabrication/Construction | ||
Energy high efficiency consulting | Engineering/Report | ||
Furnace bed cooling pipe overlay welding | Design/Material/ Fabrication | ||
H*** | #1~3 boiler tube pin hole cause analysis | Engineering/Report | 2019 |
S*** | - Gas burner - Burner pilot - Pilot burner |
Design/Material/ Fabrication | 2019 |
Steam coil air heater | Design/Material/ Fabrication | ||
Superheater tube bundle | Design/Material/ Fabrication | ||
Heater tip & nozzle | Design/Material/ Fabrication | ||
SNCR injection nozzle | Design/Material/ Fabrication | ||
Radiant tube top support | Design/Material/ Fabrication | ||
S*** | IRPC boiler burner | Design/Material/ Fabrication | 2019 |
Chain grate bar | Design/Material/ Fabrication | ||
Oil burner | Design/Material/ Fabrication | ||
L*** | ECH2 incineration boiler | Material/Construction | 2019 |
#2 ECO. tube coil | Material/Construction | ||
H*** | Bank side wall tube | Design/Material/ Fabrication/Construction | 2019 |
W*** | #4 boiler wall tube & header replacement | Material/ Fabrication/Construction | 2019 |
#15 boiler wall tube | Material/Construction | ||
H*** | Furnace bed cooling pipe overlay welding | Design/Material/ Fabrication | 2018 |
Bio boiler evaporator coil, S/H coil | Design/Material/ Fabrication/Construction | ||
Y*** | 127 T/Hr burner equipment & damper replacement | Design/Material/ Fabrication/Construction | 2018 |
S*** | - Heater tip nozzle - Burner stabiliser - Diffuser |
Design/Material/ Fabrication | 2018 |
H*** | - 400T/Hr CFBC boiler wall tube - Design engineering - Analysis report for coal surgebin silo |
Analysis Report | 2018 |
S*** | 38.9MW CFBC boiler wall tube, EVA, ECO tube replacement | Design/Material/ Fabrication/Construction | 2018 |
38.9MW CFBC boiler FBHE S/H, LT S/H, HT S/H tube replacement | Design/Material/ Fabrication/Construction | ||
38.9MW ECO. casing replacement | Design/Material/ Fabrication/Construction | ||
P*** | - 42MW ECO. expansion - Soot blower expansion, boiler piping & insulation isnstall - Combustor wall tube replacement |
Design/Material/Construction | 2018 |